On Tuesday, November 12th, 3:30 am – Wednesday, November 13th, 6 am, in order to support the vertical expansion project, an electrical outage is needed. To reduce the impact on the research community, the outage will be conducted over two mornings based on the schedule below. During each outage NO work shall take place in the B120 BSL3 suite. In addition to the effect on the BSL3 suite, there will be intermittent loss of supply and exhaust airflow to the lower level vivarium and wet lab spaces on floors 7-11 that are not a part of the vertical expansion.