November 6, 8 am – 12 pm
Load test anchors on the walkway from IWJ to FLTC. As seen in the exhibit, we will keep the lift stationary in one of the two locations (#1 or #2). We will use the lift to reach each anchor and allow traffic to pass by in both directions.
November 6, 1 pm – 4 pm
Load test the anchors on the walkway from BJCIH to FLTC. As seen in the exhibit, we will keep the lift stationary in one of the two locations (#3 or #4). This lift location requested will allow Oates to reach each anchor and allow pedestrian traffic to pass by in both directions. The working area will be coned off during testing.
November 7, 8 am – 12 pm
Load Test the anchors on the walkway from CSRB to BJCIH. To finish the load testing, we must utilize the two locations (#5 and #6) in the exhibit.
If you have any questions, please contact Antwoine Feaman, Engineering Project Manager.