On Saturday, November 16th, 6 am – 12 pm, contractors will turn off the air handler serving the lower level to make necessary repairs. During the above-noted dates and times, the lower level will notice fluctuations in temperatures and airflow.
On Saturday, November 16th, 6 am – 12 pm, contractors will turn off the air handler serving the lower level to make necessary repairs. During the above-noted dates and times, the lower level will notice fluctuations in temperatures and airflow.