On Tuesday, November 19th 3-6 am facilities will be conducting a test of the generator and Automatic Transfer Switches (ATS) for Joint Commissioning. There will be a closed transition to emergency power from the normal power, no blips are anticipated during the test. Elevators, however, will return to designated floor until transfer; and then operate on emergency power.