On Saturday, March 29th 6 am – 3 pm the humidifier that serves the 8th floor MRI will be shutdown in order to relocate the drain system.
On Saturday, March 29th 6 am – 3 pm the humidifier that serves the 8th floor MRI will be shutdown in order to relocate the drain system.