On Saturday, March 29th 8 am – 4 pm Air Handler 2 will be shutdown to facilitate the cleaning of the unit. There will be no air flow, heating or cooling capabilities on the entire second (2nd) floor of the facility. No other floors will be effected.
On Saturday, March 29th 8 am – 4 pm Air Handler 2 will be shutdown to facilitate the cleaning of the unit. There will be no air flow, heating or cooling capabilities on the entire second (2nd) floor of the facility. No other floors will be effected.