On Monday, May 26th, from 3 to 9 am, BJH Facilities will shut down the domestic water supply to the building to repair the backflow system. Both potable and non-potable water will be unavailable during this time. Labs and occupants may experience little to no water flow in restrooms, showers, kitchen break rooms, glass washrooms, and lab sinks.