On Saturday, June 28th, 7-11 am, Air Handler 2-3 will be shut down during this time to facilitate lighting upgrades. There will be no heating, cooling, or air flow to the 2nd and 3rd floors.
On Saturday, June 28th, 7-11 am, Air Handler 2-3 will be shut down during this time to facilitate lighting upgrades. There will be no heating, cooling, or air flow to the 2nd and 3rd floors.