On Saturday, June 28th, from 6 am to 12 pm, contractors will be working on the generator that provides emergency power for the building. There will be no planned power loss during this outage; however, if a problem arises during the outage where the generator is needed, we will have personnel onsite to address the outage and initiate emergency power.