On Saturday, June 28th, 6 am—4 pm, Contractors will isolate the building’s hot water to repair a leak and install valves. The building may experience areas with limited heat.
On Saturday, June 28th, 6 am—4 pm, Contractors will isolate the building’s hot water to repair a leak and install valves. The building may experience areas with limited heat.