On Friday, June 27th, 5-7 am, facilities will turn off the air handler that serves the pedestrian link and administrative offices serving the south section of the building for floors 3 through 11. During the noted outage times, the airflow to these affected areas will experience minimal to no airflow, and the temperatures will be warmer than usual. This will not affect any fume hood operation in the lab spaces.