Facilities Operations Update OFMD Update

December 20: South Building (West End of McKinley Ave. to S. Euclid Corner) Crane Set Up

On Saturday, December 20, between the hours of 6 a.m. and noon, Taylor Roofing will set up a crane on the west side of McKinley Ave between S. Euclid and the McDonnell Medical Sciences Building’s south entrance for the purpose of removing their tools and remaining debris from the South Building roof. This will be the last crane pick and will complete the project.

The lift work will completely shut down vehicular traffic on the west side of McKinley Ave, and any available parking on either side of McKinley Ave between the McDonnell Medical Sciences Building and S. Euclid will need to be blocked off with a minimum of cones and caution tape.

The north sidewalk between the McDonnell Medical Science Building’s south entrance and S. Euclid Ave, and a portion of the south sidewalk between the barrier, will be closed to pedestrian traffic due to overhead lifting and potential falling hazards. The South Building entrance on McKinley will be closed.

The entrance/exit to Core @ 718 will remain open. Please see the diagram for more information.

If you have any questions, please contact Antwoine Feaman, Project/Program Manager, at afeaman@wustl.edu.