Weather permitting, on Saturday, June 27, from 6 a.m. to 8 a.m., Taylor Roofing will be operating a crane on the south side of the East Imaging Building as part of Project #230019 – East Imaging Roof Replacement.

Below is a diagram showing the area closure required for crane operations and the location of an additional truck and trailer used to haul off the equipment being removed from the roof.

If you have any questions, please contact James Wade, Project Coordinator I, at j.wade@wustl.edu.