Facilities Operations Update OFMD Update

8/22: East McDonnell/Debra and George W. Couch III Biomedical Research Building (Couch Building) Sidewalk Closure

On August 22, from 6 a.m. to 12 p.m., Missouri Builders will be using an 85ft lift to repair a leak on the southeast side of the East McDonnell Building.

They will provide barricades to block off the sidewalk between East McDonnell and the Couch building for the duration of this repair. During this time, the barricades at the south end of the parking lot will need to be removed.