Facilities Operations Update OFMD Update

9/14-9/18: Olin Roof Repairs

From Monday, 9/14, through Wednesday, 9/16, Taylor Roofing will deliver materials and remove debris from the roof between the hours of 5:00 AM and 7:00 AM.

During these hours, their truck will be parked at the MMSB Dock. The materials will be unloaded and transported to the roof using the elevator. Floor protection will be installed and maintained throughout the work. Taylor Roofing personnel will also use the 4th-floor restrooms and will change into clean shoes before entering these areas.

Please refer to the attached document for the locations of the impacted areas.

A driver will remain with the truck during these hours and will move it if necessary.