To make repairs to the air handling system there will be reduced airflows to the 5th floor and non BSL3 spaces on the 4th floor on Saturday, December 17th 6 am – 3 pm. During this time NO work shall take place in any BSL3 lab.
To make repairs to the air handling system there will be reduced airflows to the 5th floor and non BSL3 spaces on the 4th floor on Saturday, December 17th 6 am – 3 pm. During this time NO work shall take place in any BSL3 lab.