Outages

Mallinckrodt Institute Radiology-Air Handling Unit April 10-11, 2023

Contractors will be working on the air handler that feeds floors 1 through 7. This work will be performed between the hours of 8:00 pm on April 10 6:00 AM through April 11 6 am. Floors 1 – 7 will experience loss of airflow and may see slightly warmer than normal temperatures during the dates and times noted above.