Outages

McDonnell Pediatric Research Building-MPRB 7303 Diamond BSL3 Lab Service Interruption 6/21/2023

The MPRB 7303 Diamond BSL3 Lab will be shut down briefly (approximately 15 minutes or less) at two different points during the outage times listed above in support of the scheduled decontamination of the adjacent 7302 Philips BSL3 lab. This outage is a precautionary measure as the supply/exhaust air is shut down for the Philips lab in the morning and turned back on in the afternoon. The two outages will be coordinated with the Diamond lab management team. NO work may take place in 7303-BSL3 lab during these two brief outages.

The two brief outages are scheduled to occur in the following time frames:
Outage #1: 10:00 am – 11:00 am
Outage #2: 2:15 pm – 3:15 pm