Outages

REVISED-McDonnell Medical Sciences Building-Emergency Shower Service Interruption 7/25/2024

On Wednesday, July 24th 8-10 am Facilities maintenance personnel will need to perform work within the McDonnell Medical Science Building, 5th Floor 562 BSL3 Lab Suite. Work includes conducting a flow test on an emergency shower in the ante room and cleaning of a light fixture within the BSL3. NO work shall take place within any of the BSL3 labs as a precaution during the above noted times.