Outages

REVISED Specialized Research Facility East-Electric Service Interruption 11/7/2024

On Thursday, November 7, 7-11 am, facilities will conduct an emergency power test to determine if the 1800 Kw generator can support both SIRF and SIRF-East together, along with the chillers. There will be no loss of power to the SIRF building. SIRF-East will be the only building affected by this outage. SIRF-East utilities will be affected: lighting, receptacles, HVAC pumps, and elevators. All normal power will be restored after this test.