On Wednesday, November 20th, from 3-6 am, Facilities Operations will upgrade the HVAC controls during the above-noted date and time. During this time, occupants on all floors( except the vertical expansion areas), including the LL vivarium and BSL3 suite, will experience a loss/reduction of supply and exhaust flow to their lab spaces. No work shall take place in BSL3 suite B120.