Outages

East McDonnell Facility-Electric Service Interruption 3/15/2025

On Saturday, March 15, from 7 to 11 am, facilities and contractors will conduct electrical switchgear maintenance on the building’s “W” feeder. The maintenance will consist of half the building being de-energized to perform necessary testing. There will be a loss of normal power to receptacles basement levels to third fl., lighting from fifth floor to PH, MCC-P.