To perform preventive maintenance, facilities will conduct two outages on the dates and times noted below. During this time, NO work shall be conducted in BSL3 suite B120.
9/24 5 am – 7 am
9/25 5 am – 7 am
To perform preventive maintenance, facilities will conduct two outages on the dates and times noted below. During this time, NO work shall be conducted in BSL3 suite B120.
9/24 5 am – 7 am
9/25 5 am – 7 am