Between October 10, 3 p.m. and October 13, 7 a.m. Facilities will be assisting contractors in shutting down the exhaust system that serves fume hoods 402, 404, and 406 to install ductwork modifications. During the specified dates and times, no work in the fume hoods will be allowed.