2/10-2/19: Partial Sidewalk Closure at S. Euclid and McKinley

Two columns (part of the South Building’s fence) located on the corner of S. Euclid and McKinley Avenues will be repaired, weather permitting, from February 10-19. There will be a partial sidewalk closure at the southwest corner for safety purposes from 7 a.m. to 3:30 p.m. Please use the nearest crosswalks to cross the street […]

2/20-22: 4488 Forest Park Avenue Portions of Parking Lot Closed for Crane Lift

On Saturday, February 21, portions of the 4488 Forest Ave building parking lot will be blocked off perform crane lift operations to install new equipment on the roof. Parking spaces along the south side of the building will be blocked off starting the evening of February 20 through February 22, and the entire south side […]

2/28: Biotechnology Center, Planned Service Interruption – DI Water

On 2/28 from 4am to 4pm, there will be no DI (Deionized) water available throughout the facility. This outage is required to install a new DI system. We kindly request that you refrain from using any DI water during this time. Thank you for your cooperation.