Couch Biomedical Research Building-Electric Service Interruption 5/7/2023

This will be the first of two outages. On Sunday, May 7th 7 – 11 am. The purpose of this outage is to perform maintenance and testing on the main electrical switchgear that distributes power throughout the 4515 Couch Building. This requires de-energizing half of the main electrical switchgear, fed from the ‘D’ utility, so […]

Mallinckrodt Institute Radiology-Air Handling Unit Service Interruption 4/16-4/17/2023

Contractors will be working on the air handler that feeds floors 1 through 7 in preparation for cleaning the entire air handler. This air handler will be off at various times throughout April 16th 8 am -17th 6 am. Floors 1 through 7 may experience loss of airflow and slightly warmer than normal temperatures during […]

Southwest Tower-Air Handling Unit Service Interruption 4/22/2023

Facilities will be working on air handler units that serve floors six, seven, and eight. These floors may experience loss of airflow and slightly warmer than normal temperatures on Saturday, April 22nd 6 am – 10 am. No fume hoods will be affected by this outage.

Mallinckrodt Institute Radiology-Air Handling Unit 4/17-20/2023

Contractors will be making multiple repairs to the air handler that feeds floors 1 through 7. These repairs will be performed during the hours of 8:00 pm to 6:00 am each night. Floors 1-7 will experience loss of airflow and may see slightly warmer than normal temperatures during the evenings noted above.

Mallinckrodt Institute Radiology-Air Handling Unit April 10-11, 2023

Contractors will be working on the air handler that feeds floors 1 through 7. This work will be performed between the hours of 8:00 pm on April 10 6:00 AM through April 11 6 am. Floors 1 – 7 will experience loss of airflow and may see slightly warmer than normal temperatures during the dates […]

McDonnell Pediatric Research Building, CSRB North Tower Addition, Clinical Sciences Research Building, Wohl Clinic, Wohl Hospital, Barnard Hospital, Renard Hospital-Electric Service Interruption 4/19-21/2023

Facilities Electricians will need to perform switching in the CSR-Substation, which provides power to the above listed buildings. This is to support Ameren de-energizing their equipment for maintenance work. During April 19 6 am – April 21 1 pm, the CSRB Substation will be single lined to one utility, instead of the normal two utilities. […]