CSRB North Tower Addition-Elevator Service Interruption 6/27/2025

Elevators in this building will be out of service, one at a time, for approximately 2 to 4 hours between 7:00 am, and 3:30 pm on June 27th, to conduct inspections and fire recall tests as required by the Elevator Safety Unit of the Missouri Department of Public Safety. The elevators will be selected on […]

McDonnell Pediatric Research Building-Air Handling Unit Service Interruption 6/27/2025

On Friday, June 27th, 5-7 am, facilities will turn off the air handler that serves the pedestrian link and administrative offices serving the south section of the building for floors 3 through 11. During the noted outage times, the airflow to these affected areas will experience minimal to no airflow, and the temperatures will be […]

BJHS West Pavilion-Electric Service Interruption /7/10/2025

On Thursday, July 10th, 4-4:35 am, contractors will be transferring power to work on the new tower project. Power for the receptacle on the 10th fl., west side of the building, will be affected. The duration should be no longer than 35 minutes.

Biotechnology Center-Exhaust Fan Service Interruption 6/27/2025

On Friday, June 27th, 8-10 am, the Strobic Exhaust system will be shut down for maintenance. This will affect the 4th floor fume hoods and the general exhaust for the entire floor. Please do not use fume hoods during this time. Thank you for your patience during this time.

Gary C. Werths Siteman Cancer Center-Electric Service Interruption 6/28/2025

On Saturday, June 28th, from 6 am to 12 pm, contractors will be working on the generator that provides emergency power for the building. There will be no planned power loss during this outage; however, if a problem arises during the outage where the generator is needed, we will have personnel onsite to address the […]