CSRB North Tower Addition-4th floor biohazard area Service Interruption

DCM is contracting with PASS Security to replace the existing 4th floor ABSL3 lock sets and associated infrastructure on the 4th floor. PASS will be installing the wireless network infrastructure over the the course of two overnight outages as identified below. NO work may occur in the 4th floor biohazard area during the work periods […]

McDonnell Pediatric Research Building-Air Handling Unit Service Interruption 1/13-17/2025

OFMD will be completing a series of outages to replace an automatic transfer switch (ATS) that serves several critical systems in the building. (An automatic transfer switch (ATS) is a device that automatically switches the power supply from the main/normal utility electrical source to a backup generator when it detects a power outage.) Monday, January […]

East Building-Elevator Service Interruption 1/12-14/2025

As part of the modernization project on elevator #47, both East Building elevators will be removed from service, allowing Midwest Elevator to perform work in the shaft. Elevator #48 will be removed from service on Sunday, January 12th, at 10 pm and returned to service at 6 am on Monday, January 13th. If needed Midwest […]