Cancer Research Building-Electric Service Interruption 6/24/2024-6/27/2024

Elevators in the listed buildings will be out of service to be tested on emergency generator power, from 6 am to 7 am each day, starting on June 24 – June 26. During this time lighting and equipment connected to the emergency power system may experience a blip when power is transferred. The list that […]

Taylor Avenue Building-Women’s ADA Restroom Service Interruption 6/26/2024

On Wednesday, June 26th 9:30 am the Women’s ADA restroom will be closed for roughly two years to provide a temporary lactation room. Please use the Men’s ADA restroom starting June 26th. The Men’s restroom sign will be changed to unisex soon. Thank you for your understanding

Mallinckrodt Institute Radiology-Steam Service Interruption 6/26/2024

On Wednesday, June 26th 3 am – 3pm contractors will be making necessary repairs to the steam system. Facilities will turn off the steam serving the entire building. Facilities will monitor and make adjustments to control building temperatures. Some areas may experience cooler-than-normal temperatures during this time.

East Building, East Imaging Center-Elevator Service Interruption 6/27/2024

Facilities will be testing the new fire alarm system in East Bldg. and in East Imaging. During the test elevators # 47, #48, and #49 will be individually taken out of service for a brief period of time. While one elevator is down, the other elevators will still be in service.

Clinical Sciences Research Building-Exhaust Fan Service Interruption 6/22/2024

On Saturday, June 22nd 7 am – 3 pm contractors will turn off the exhaust fan that serves the fume hoods on the North side of the 6th floor. No work should be performed in the fume hoods during this outage. The supply air will remain on to maintain temperatures during this outage.