Mallinckrodt Institute Radiology, Clayton Garage, Metro Garage, Barnard Hospital, Cancer Research Building, Core@818, Wohl Hospital, Specialized Research Facility East-Elevator Service Interruption 6/24-28/2024

Elevators in these buildings will be out of service for about 2 to 4 hours between 7:00 am and 3:30 pm on June 24th – June 28th, to conduct annual inspections and fire recall tests as required by the Elevator Safety Unit of the Missouri Department of Public Safety. The elevators will be selected on […]

4480 Clayton-Domestic Cold Water Service Interruption 6/20/2024

On June 20th from 1 am to 6 am there will be no hot or cold water to the 4480 Clayton building for construction on the first floor. In this time there will be no water to restrooms, breakroom sinks, and anything else needing water.

CSRB North Tower Addition-Fire Alarm Service Interruption 6/14/2024

On Friday, June 14th 5-7 am we will be testing the Audio/Visuals for the Fire Alarms system in CSRB North Tower Addition. During this testing you will hear messages and see strobes, occupants do not need to leave the building during this test.

Wohl Clinic-Electric Service Interruption 6/22-23/2024

The Wohl Clinic Emergency Power Generator will be off-line from 5 pm on Saturday, June 22nd, to 5 pm Sunday, June 23rd. Contractors will be replacing/upgrading the emergency power distribution equipment during this time. We do not anticipate any power loss during this time. The generator will be returned to service once all work is […]