On Wednesday, February 21st 9-10 am Facilities with Emergency Management will be conducting testing of the Alertus emergency system. During this time you will hear messages playing, you do not need to leave the building during this testing.
Author: Melanie
Desegregation History Wall installation begins February 12th
Washington University School of Medicine and BJC HealthCare will soon unveil a permanent display highlighting the history of desegregation at WashU Medicine, Barnes-Jewish Hospital and St. Louis Children’s Hospital. The Desegregation History Wall will be located on the second-floor link of the BJC Institute of Health. The wall depicts the historical experiences of Black and […]
Steven & Susan Lipstein BJC Institute of Health-Chilled Water Service Interruption 2/16-18/2024
Facilities will be assisting contractors with draining the chilled water for the entire building. No chilled water will be available from 11:00 pm February 16th to 10:00 AM February 18th. This will affect all systems that use chilled water. Temperatures in the building will be warmer than normal in some areas. Temporary cooling will be […]
CSRB North Tower Addition-Electric Service Interruption 3/10/2024 – 7-11 am
The purpose of this outage is to perform maintenance and testing on the ‘D’ feed portion of the NTA main electrical switchgear. Facilities electricians will perform switching, to isolate and de-energize the ‘D’ feed. Facilities electricians and Service Contractors will inspect and test the breakers, relays, and major components of the de-energized portion of the […]
Jeffrey T. Fort Neuroscience Research Building-DI Water Service Interruption 2/24/2024
On Saturday, February 24th 2 am – 2 pm RO water will be shut off to the entire building during this outage. Please make sure to have RO water stored in tanks if ample amounts are going to be used this day. Sorry for any inconvenience this may cause.
CSRB North Tower Addition-Electric Service Interruption 3/10/2024 7-11 am
The purpose of this outage is to perform maintenance and testing on the ‘D’ feed portion of the NTA main electrical switchgear. Facilities electricians will perform switching, to isolate and de-energize the ‘D’ feed. Facilities electricians and Service Contractors will inspect and test the breakers, relays, and major components of the de-energized portion of the […]
REVISED-Wohl Clinic, Wohl Hospital, Barnard Hospital, Renard Hospital, CSRB North Tower Addition, Clinical Sciences Research Building, McDonnell Pediatric Research Building-Electric Service Interruption 2/25/2024
On Sunday, February 25th 4-7 am Facilities contractor’s will be trouble shooting switchgear, no power loss or blips is expected. As a precautionary measure , no work may occur in NTA 4th fl. ABSL3 suites and PEDS MPRB suites 7230, 7301,730 and 7230.
McDonnell Pediatric Research Building-MPRB 7230 BSL3 suite and 8201C-BSL3 lab Service Interruption 2/12-19/2024
The effluent decontamination system (EDS) serving the MPRB 7230 BSL3 suite and 8201C-BSL3 lab will be out of service to accommodate the annual preventative maintenance and calibration of this system. Research work may continue in the 7230 BSL3 suite and 8201C-BSL3 lab during this outage between February 12th 7am -19th 7 am.
McDonnell Pediatric Research Building-BSL3 lab 8201C Service Interruption 2/8-9/2024
Starting at 9 pm on February 8th BSL3 lab 8201C will be out of service to prepare for plumbing repairs in the lab. Other labs within the suite will be available until 7 am on February 9th. Starting at 7 am on February 9th Suite 8201 will be out of service. NO work shall take […]
Mallinckrodt Institute Radiology-Elevator Service Interruption 3/10/2024
Elevator 102 will be out of service on Sunday, March 10th, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back on service at noon.