On Wednesday, January 24th starting at 6 am to January 26th at 3:30 pm the women’s locker room in the basement of the Olin Residence Hall for repairs. In this time there can be no use to the women’s locker room.
Author: Melanie
Mallinckrodt Institute Radiology-Elevator Service Interruption 2/4/2024
Elevator 102 will be out of service on Sunday, February 4, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back on service at noon.
Mallinckrodt Institute Radiology-Elevator Service Interruption 2/18/2024
Elevator 103 will be out of service on Sunday, February 18, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back in service at noon.
Clinical Sciences Research Building-Hot Water Service Interruption 1/26/2024
On Friday, January 26th 2-10 am Facilities will be assisting contractors with draining the heating hot water for the 7th floor. The temperatures for the air handler supply will be raised to provide heat to the entire floor. The entire floor may experience cooler-than-normal temperatures during this time.
McDonnell Pediatric Research Building-Air Handling Unit Service Interruption 1/23-1/25
In support of the new 8210 BSL3 suite, OFMD will be completing failure mode testing of the suite. The testing will impact all of the labs in MPRB including the BSL3 suites. To minimize the impact on the lab occupants, the testing will be completed on an overnight schedule as follows: Tuesday, January 23rd: 9:00 […]
Steven & Susan Lipstein BJC Institute of Health-Exhaust Fan Service Interruption 1/26/2024
On Friday, January 26th 3:00 am – 8:00 pm contractors will be working on repairing the door to B147 in the B120 suite. During this time occupants can expect to hear construction noise in the basement vivarium area.
CSRB North Tower Addition-451/461 ABSL3 Suite Service Interruption 2/26/2021
On Monday, February 26th 6:00 am – 10:00 pm Johnson Controls will be replacing the network control engine that serves 451/461 ABSL3 suite. NO work may occur in the 451/461 ABSL3 suite during this outage. Other ABSL3 suites in the 4th floor biohazard area will be available during this outage.
CSRB North Tower Addition-432/442 ABSL3 Suite-Service Interruption 2/19/2024
On Monday, February 19th 6:00 am – 10:00 pm Johnson Controls will be replacing the network control engine that serves 432/442 ABSL3 suite. NO work may occur in the 432/442 ABSL3 suite during this outage. All other ABSL3 suites in the 4th floor biohazard area will be available during this outage.
Neuroscience Research Building-Vacuum Service Interruption 2/3/2024
The vacuum system for the NRB building will be out of service for upgrades and repairs on February 3rd 6:00 am – 3:00 pm. During this time anything attached to vacuum will not be in service. Please make sure that any experiments or equipment that uses vacuum is scheduled around this outage. Sorry for any […]
Renard tuck pointing extended
Between 6:30 pm and 2:00 am, Western Specialty Contractors continue performing tuckpointing and mortar repairs on the Renard Hospital facade. The work has been performed by swing stage and does not impact south dock operations, deliveries, or pick-ups. The project is weather dependent and continues to run when weather conditions are within the acceptable range […]