CSRB North Tower Addition-Air Handling Unit Service Interruption 10/24-12/05/2024

Facilities Engineering is completing a project to clean and seal all the air handling systems serving North Tower Addition. The 4th and 5th floor HVAC will be affected during the dates and times noted below. During these times NO work shall be conducted in any BSL3 lab on the 4th floor. During the outages, other […]

Jeffrey T. Fort Neuroscience Research Building-Steam Service Interruption 10/25-26/2024

There will be a steam outage from Friday, October 25th, 5 pm to Saturday, October 26th, 7 pm. This outage is needed to repair the main steam system coming into the building. During this outage, our backup heating equipment will generate a minimum amount of heat. All other equipment, such as cage washes, autoclaves, sterilizers, […]

Barnard Hospital-Fire Alarm Service Interruption 11/5/2024

On Tuesday, November 5th, 9-11 am, the facilities Fire/Alarm team will be conducting an inspection of the upgraded F/A system on the 8th floor. The affected areas will be the 7th, 8th, and PH floors. Audibles and strobes will be witnessed in the building. “THIS IS ONLY A TEST.” There is no need for evacuation.

Siteman Cancer Center-Electric Service Interruption 11/1/2024

On Friday, November 1, from 4-7 am, facilities will test the Generator and ATS (Automatic Transfer Switch). There will be a quick blip during the transfer to emergency power. Some lighting and receptacles are red and some mechanical equipment supplied with emergency power will be affected during the transfer.