On Thursday, October 10 6:30-8:30 am facilities technician will be troubleshooting and repairing a door issue inside the B120 suite. During this time NO work shall take place with the B120 BSL3 suite.
Author: Melanie
REVISED-CSRB North Tower Addition-Elevator Service Interruption 10/24-28/2024
Elevator #2 will be removed from service on Friday, October 24 at 6 am, to replace the flooring. It will be returned to service on Monday, October 28 7 am.
CSRB North Tower Addition-Elevator Service Interruption 10/18-21/2024
Elevator #1 will be removed from service on Friday, October 18, 6 am to replace the flooring. It will be returned to service on Monday, October 21 7 am.
CSRB North Tower Addition-Humidifier Service Interruption 10/9/2024
On Wednesday, October 9th 1:30-4:30 pm maintenance work will be completed on the humidifier of the terminal equipment serving the NTA 434/445 suite. Although facilities does not expect any impact to the performance of the BSL3 lab as a precaution NO work shall take place in the 434/445 lab suite during the above noted times.
Jeffrey T. Fort Neuroscience Research Building-Fire Alarm Service Interruption 10/10-15/2024
We will be conducting a fire alarm system pre-test and a full test in support of the 10th floor fit out. Areas that will be affected are levels 9, 10 and 11 and stairwells. Please be aware that the all fire alarm notification devices will be activated (horns/strobes/speakers). These tests will take place 6-8 am […]
CSRB North Tower Addition-Elevator Service Interruption 10/7-14/2024
Elevator #3 is out of service due to needed repairs. The elevator will be returned to service once the repairs are complete.
REVISED Specialized Research Facility East-Electric Service Interruption 11/7/2024
On Thursday, November 7, 7-11 am, facilities will conduct an emergency power test to determine if the 1800 Kw generator can support both SIRF and SIRF-East together, along with the chillers. There will be no loss of power to the SIRF building. SIRF-East will be the only building affected by this outage. SIRF-East utilities will […]
Mallinckrodt Institute Radiology-Electric Institute Radiology 11/3/2024
On Sunday, November 3rd 7-11 am, facilities will be conducting an electrical outage of the entire building. The purpose of this outage is to clean the (6) 5Kv. switches located in the basement of the MIR building. In order to safely perform the required work, the utility power must be turned off. The generator will […]
Biotechnology Center-Air Handling Unit 10/9/2024
On October 9th from 4 am to 7 am Air handling units 1 and 2 will be down for scheduled cleaning in the Biotechnology Center. In this time there will be limited to no air flow, heating, or cooling to the building.
REVISED-CSRB North Tower Addition-Humidifier Service Interruption 10/10/2024
On Thursday, October 10th 1:30-4:30 Pm maintenance work will be completed on the humidifier of the terminal equipment serving the NTA 452/462 suite. Although facilities do not expect any impact to the performance of the BSL3 lab as a precaution NO work shall take place in the 452/462 lab suite during the above-noted times.