West Building-Air Handling Unit Service Interruption 10/21/2025

At approximately 5:50 a.m. there was a mechanical failure with an Air Handler Unit that serves the 5th floor. At this time Facilities Engineering is in the process of recovering the Air Handler Unit. A follow-up message will be delivered once all mechanical systems and room pressures are working in a normal manner.

Barnard Hospital-Air Handling Unit Service Interruption 10/22-24/2025

On Wednesday, October 22, from 7:00 a.m. to Friday, October 24, at4:00 p.m., the Air Handler Unit will be shut off as the controls are upgraded. The purpose of this outage is to replace the legacy temperature control system that supports the basement Cyclotron Air Handler Unit. During this outage,

Couch Biomedical Research Building-Chilled Water Service Interruption 10/24-27/2025

Just to let you know, the Facilities department will be shutting down all chilled water supply to the facility to help contractors replace a chilled water control valve. Between October 24, 6:00 p.m., and October 27, 6:00 a.m., chilled water will be unavailable for the building’s cooling systems, microscopes, and any other equipment that requires […]

McDonnell Pediatric Research Building-Air Handling Unit 11/8/2025 6 am-8 pm

Facilities will turn off the air handler for equipment upgrades. The areas affected by this outage will be the administrative offices serving the south section of the building for floors 3 through 11, second floor pedestrian link, and main lobby. During the noted outage times, the airflow to these affected areas will experience minimal to […]

Northwest Tower, Mid Campus Center-Elevator Service Interruption 10/29-30/2025

Elevators in the listed buildings will be out of service for testing on emergency generator power each day between 5:00 am and 6:00 am. During this time, lighting and equipment connected to the emergency power system may experience a brief disruption when the power is transferred. The following list indicates which buildings’ elevators will be […]