On Tuesday, August 23rd 2-3 pm, Facilities Technicians will be performing work in the 7230 BSL3 suite. During this time NO work shall be allowed in the BS3 suite.
Category: Outages
East McDonnell Facility-Electric Service Interruption 9/9/2025
On Tuesday, September 9, from 4-5 am, facilities will be conducting a test of the building’s emergency electrical system. There will be a total building electrical shutdown to allow the electrical infrastructure to become fully self-supporting. This ensures that all emergency power is available and operating as intended in the event of an actual emergency.
McDonnell Medical Sciences Building-Elevator Service Interruption 9/3/2025
On Wednesday, September 3, 5-6 am, as part of the 9th FL construction project, the elevators will be briefly out of service while the cab lights are rewired from a temporary power source to a permanent one.
Steven & Susan Lipstein BJC Institute of Health-Air Handling Unit Service Interruption 8/28-8/29/2025
Testing will be completed on the air handling systems serving the Vertical Expansion wet labs and basement vivarium. Supply air to the basement vivarium will be reduced intermittently during the outage with little to no impact to space temperature and humidity. Exhaust air to the Vertical Expansion wet labs will be off intermittently during the […]
Steven & Susan Lipstein BJC Institute of Health-Exhaust Fan Service Interruption 9/15/2025
On Monday, September 15th, from 6-9 pm, Facilities will perform preventive maintenance on the lab exhaust system for floors 7 through 11 in the south tower. During this time, lab occupants may experience little to no airflow. Additionally, no work will be allowed in the fume hoods.
Core@818-Domestic Hot Water Service Interruption 8/26/2025
On Tuesday, August 26th, from 8 am to 4 pm, there will be no domestic hot water available throughout the entire facility. This is to assist contractors in tying in components to the hot water system. All sinks, showers, and all equipment utilizing hot water will be affected.
North Medical Building, Cancer Research Building, South Medical Building, Steven & Susan Lipstein BJC Institute of Health, Maternity Hospital, McMillan Hospital, Irene W Johnson Institute Rehab, Olin Residence Hall, McDonnell Medical Sciences Building, Bernard Becker Medical Library, Mallinckrodt Institute Radiology, Renard Hospital, Clinical Sciences Research Building, Wohl Clinic, Wohl Hospital, West Building, Barnard Hospital, Farrell Learning & Teaching Center, Biotechnology Center, Euclid Power Plant-Domestic Hot Water 8/5-6/2025
On August 5th, from 9:30 pm to August 6th, 3:30 am, Facilities will shut off the domestic hot water to all the buildings listed above for necessary repairs. None of these buildings will not have domestic hot water during the dates and times noted above.
Steven & Susan Lipstein BJC Institute of Health, Mid Campus Center 8/7/2025
Thursday, August 7th, 3-5 am, Facilities, Ameren, and the Contractor will be conducting a test of the power distribution system that supplies power to both buildings. Facilities will transfer power in both buildings before the power distribution test to ensure that there is no power loss or interruption to either building during the testing process.
Wohl Hospital-Chilled Water Service Interruption 7/26/2025
On July 26th, from 4 am to 4 pm, Facilities will shut down the chilled water supply to floors 9 and 10 to assist contractors with the demolition and installation of temporary cooling systems for the duration of the ongoing HVAC renovation in the area. Staff in these areas may notice warmer-than-normal temperatures during this […]
Mallinckrodt Institute Radiology-Elevator Service Interruption 7/27/2025
Elevator 103 will be out of service on Sunday, July 27th, at 8 AM for 4 hours to perform preventive maintenance. The elevator will be back in service at noon.