On Wednesday, March 26th, from 7-9 am, facilities, along with the contractor, will be conducting a test of the fire alarm system. There will be strobes and horns witnessed throughout the building. No need for evacuation.
Category: Outages
Gary C. Werths Siteman Cancer Center-Electric Service Interruption 4/5/2025
On Saturday, April 5th, from 7-11 am, all electricity in the building will be off, with the except of anything on emergency backup power. Guarantee Electric will be installing shunt trips into the normal power switchgear.
Eric P Newman Education Center-Fire Alarm Service Interruption 3/27/2025
On Thursday, March 27th, from 7-9 am, WUSM facilities, along with contractors, will conduct a test of the fire alarm system. There will be strobes and horns witnessed throughout the building during such time. This is only a test; no need for evacuation.
Steven & Susan Lipstein BJC Institute of Health-Eyewash in BSL# Suite B120 Service Interruption 3/21/2025
On Friday, March 21st 7-9 am, facilities plumbers will be making the repairs to the eyewash in BSL3 suite B120. During this time NO work shall take place in the B120 Suite.
South Medical Building-Air Handling Unit Service Interruption 3/29/2025
On Saturday, March 29th 8 am – 4 pm Air Handler 2 will be shutdown to facilitate the cleaning of the unit. There will be no air flow, heating or cooling capabilities on the entire second (2nd) floor of the facility. No other floors will be effected.
McDonnell Pediatric Research Building-Exhaust Fan Service Interruption 3/25-27/2025
During the dates and times noted below, facilities technicians will be performing preventative maintenance on the HVAC systems that serve all BSL3 labs in the building. During these times, NO work shall take place in BSL3 suites 7302,7303, 7230,8201, and 8210. March 25, 2025: 3:00 am to 7:00 amMarch 26, 2025: 3:00 am to 7:00 […]
Steven & Susan Lipstein BJC Institute of Health-Air Handling Unit Service Interruption 3/27/25
On Thursday, March 27th 4-6 am, facilities technicians will be performing preventative maintenance on HVAC systems serving the lower level vivarium and BSL3 suite. During this time NO work shall take place in BSL3 suite B120.
CANCELED-Taylor Avenue Building-Fire Alarm Service Interruption 3/28/2025
On Friday, March 28th 9:30-11:30 am, facilities along with contractor and the City of St. Louis inspector will be conducting a test of the fire alarm system. There will be strobes and horns witnessed throughout the building. No need for evacuation.
REVISED-Taylor Avenue Building-Fire Alarm Service Interruption 3/27/2025
On Thursday, March 27th, from 9 to 11:30 am, facilities, along with St. Louis City Inspectors, will conduct a test of the fire alarm system. There will be strobes and horns throughout the building; no evacuation is necessary.
Gary C. Werths Siteman Cancer Center-Humidifier Service Interruption 3/29/2025
On Saturday, March 29th 6 am – 3 pm the humidifier that serves the 8th floor MRI will be shutdown in order to relocate the drain system.