On Wednesday, August 9th 7-8 am Facilities door technician will be installing new doors sweeps for the entry and exit door of BSL3 lab 434/445. In addition, the door technician will be investigating a door issue in BSL3 lab 443. During this time NO work shall be conducted in 443
Category: Outages
Clinical Sciences Research Building, CSRB North Tower Addition-Gas Service Interruption 8/10/2023
On Thursday, August 10 5-7 am Facilities will be turning off the gas that supplies the entire buildings of CSRB and CSRB NTA. There will be no gas available to any labs or equipment that uses natural gas during this time.
McDonnell Pediatric Research Building-BSL3 lab suite 8210 Service Interruption
To support the construction of BSL3 lab suite 8210 and investigate an electrical issue, BSL3 lab suite 8201 will be unavailable on Wednesday, August 2nd 6-7 am. During this time no BSL3 work shall be conducted.
4444 Forest Park Ave., Grant Medical Building, 4488 Forest Park, Farrell Learning & Teaching Center, Euclid Power Plant, 4480 Clayton, Bernard Becker Medical Library, Northwest Tower, McDonnell Medical Sciences Building, Mallinckrodt Institute Radiology-
Elevators in this building will be out of service for about 2 to 4 hours between 7:00 am and 3:30 pm on August 7 – August 10, to conduct annual inspections and fire recall tests as required by the Elevator Safety Unit of the Missouri Department of Public Safety. The elevators will be selected on […]
Renard Hospital-Fire Alarm Service Interruption 8/3/2023
As part of the renovation project on the 6th and 7th floors of Renard Hospital Contractors/Facilities will be testing the Audio/Visuals for the fire alarm system in Renard on Thursday, August 3rd 9 am – 12 pm. During this time, you will hear messages and see strobes throughout the entire building, occupants do not need […]
Southwest Tower-Steam Service Interruption 7/29-30/2023
Facilities will be turning off the steam that serves floors 6, 7, and 8 on Saturday, July 29th 7 pm to Sunday, July 30th 5 am. There will be no steam to autoclaves during this time. These floors will experience cooler-than-normal temperatures during the above-noted dates and times.
North Medical Building, South Medical Building, Cancer Research Building-DI Water Service Interruption
On Friday, July 28th from 3 am to 8 am there will be an RO/DI outage for the buildings listed above, this is for tie in for the construction on the 4th and 5th floor of the Cancer Research Building. In these times there will be limited to no RO/DI to sinks or equipment that […]
Southwest Tower-Air Handling Unit Service Interruption 8/12/2023
On Saturday, August 12th 6 am – 2 pm Facilities will perform maintenance on the air handlers that serve floors 6, 7, and 8. Floors 6, 7, and 8 may experience slightly warmer than normal temperatures during the above-noted date and times.
Southwest Tower-Exhaust Fan Service Interruption 8/5/2023
On Saturday, August 5th 6 am – 2pm Facilities will be performing maintenance on the exhaust fans that serves floor 6, 7, and 8. No work should be performed in fume hoods on these floors during the above-noted date and times.
East Imaging Center-Air Handling Unit 8/4/2023
On Friday, August 4th from 3 pm to 5 pm Air handling units B1 and B2 will be turned off at separate times in the East Imaging Center for inspections. In these times there will be little to no air flow and cooling to the basement and cyclotrons in the building.