On Friday, August 4th 5-7 am Facilities will be shutting down air handler units and exhaust fans that serve floors 7-11. No work should be performed in fume hoods during this outage. Facilities will monitor temperatures during this outage.
Category: Outages
Biotechnology Center-Exhaust Fan Service Interruption 8/19/2023
On Saturday, August 19th from 5:30 am to 6 pm there will be a building wide exhaust outage for the Biotechnology Center building for a motor replacement. In this time the will be limited to no exhaust flow to the bathrooms and the fume hoods for the entire building.
McDonnell Medical Sciences Building-Air Handling Unit Service Interruption 7/22/2023
On Saturday, July 22nd from 5 am to 2 pm in the McDonnell Medical Sciences Building Air Handling Unit 8 will be off for repairs. In this time there will be limited to no cooling or air flow to the 8th floor of the building.
Maternity Hospital-Men’s Restroom Service Interruption 7/28-31/2023
5007 Men’s Restroom will be closed to repair the ceiling. Please use the restroom on the 4th floor or the 7th floor. Sorry for the inconvenience.
4533 Clayton Ave, East Building-Gas Service Interruption 7/27/2023
On Thursday, July 27th from 5 am to 7 am there will be a gas outage to the 4533 Clayton Ave. building and East Building for maintenance on the gas meter. In these times there will be limited to no gas for building heat, domestic heating hot water, and Bunsen burners.
Taylor Avenue Building, 620 S Taylor-Gas Service Interruption 7/25/2023
On Tuesday, July 25th from 5 am to 7 am there will be a gas outage to the Taylor Avenue building and 620 S. Taylor building for maintenance on the gas meter. In these times there will be limited to no gas for building heat, domestic heating hot water, and Bunsen burners.
Renard Hospital-Air Handling Unit Service Interruption 7/28-30/2023
Contractors will be working on the air handler unit that serves floors 5, 6, and 7. The air handler will be off from Friday, July 28th 5 pm until Sunday, July 30th 10 am. All three floors will experience warmer-than-normal temperatures during the above-noted dates and times.
Barnard Hospital-Restroom’s Service Interruption 7/26-28/2023
On July 26th 6 am – July 28th 4 pm, the Men’s and Women’s restrooms located on the first floor of Barnard Hospital will be closed for preventative maintenance and repairs to the automatic door operators. At this time we will also be installing new lock assemblies at the openings. Alternate restrooms can be found […]
Maternity Hospital-Men’s Restroom 6007 Service Interruption 7/20-24/2023
Men’s restroom 6007 will be closed for ceiling repairs July 20th-24th. Please use men’s restrooms on the 5th floor or on the 6th floor during this time. We thank you for your understanding during this ceiling repair.
Mallinckrodt Institute Radiology-Elevator Service Interruption 8/20/2023
Elevator 103 will be out of service on Sunday, August 20, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back in service at noon.