On Saturday, March 1st, from 6 am to 6 pm, facilities will drain the heating water system to assist in installing heating water valves for the fourth-floor construction. During this time, Olin Hall and the Shell Café will not have heating capabilities.
Category: Outages
McDonnell Medical Sciences Building-Air Handling Unit Service Interruption 2/26/2025
On Wednesday, February 26th, from 4 to 8 a.m., facilities will be conducting quarterly maintenance on Air Handler 2, which feeds BSL LAB 562. During this time, Air Handler 2 will be shut down, and the lab will have no airflow. NO WORK may be accomplished in the BSL 3 lab during this time.
West Building-DI Water Service Interruption 2/24-2/28/2025
Due to a mechanical failure in the DI systems serving the West Building labs, users of that system may experience little to no flow from Monday, February 24th, 12 pm, to Friday, February 28th, 3:30 pm. Evoqua technicians are currently working on getting the system back online.
CSRB North Tower Addition-Electric Service Interruption 2/21/2025
On Friday, February 21st, 4-6 am, the emergency lighting circuit for the NTA elevator lobbies will be shut off to reconnect the 4FL new emergency lighting and disconnect 7FL emergency lighting. This emergency circuit impacts BSL-3 lab lighting on the 4FL. NO work may occur in the 4th floor biohazard area during this outage.
Mallinckrodt Institute Radiology-Elevator Service Interruption 3/9/2025
Elevator 102 will be out of service on Sunday, March 9th, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back in service at noon.
Steven & Susan Lipstein BJC Institute of Health-Air Handling Unit 2/20/2025
On Thursday, February 20th, 5-7 am, OFMD will be working with Johnson Controls to troubleshoot the controller for one of the basement vivarium supply air units (AHU-9). NO work may occur in B120 ABSL3 suite during this outage.
South Medical Building-Exhaust Fan Service Interruption 2/22/22025
On Saturday, February 22nd, 7 am – 5 pm, exhaust fans 8B & 8C will be shut down to facilitate facilities in the repair of the exhaust fans. This outage will affect fume hoods in rooms 1902, 1905, 1906, 1911A, 1911B, 1914, 2902, 2903, 2916, 2917, 4929A and 4929B. During this time there will be […]
Jeffrey T. Fort Neuroscience Research Building-Domestic Hot Water 2/23/2025
On Sunday, February 23rd, from 12 to 8 am, the building will have limited hot water and decreasing hot water temperature. Please DO NOT use showers or cage wash machines during this time.
East McDonnell Facility-Electric Service Interruption 3/22/2025
On Saturday, March 22nd, 7-11 am, facilities, and contractors will be conducting electrical maintenance on the building “D” feeder. The maintenance will consist of half the building being de-energized to perform necessary testing. There will be a loss of normal power to lighting from the basement to the fourth floor, MCC-5, and some receptacles from […]
East McDonnell Facility-Electric Service Interruption 3/15/2025
On Saturday, March 15, from 7 to 11 am, facilities and contractors will conduct electrical switchgear maintenance on the building’s “W” feeder. The maintenance will consist of half the building being de-energized to perform necessary testing. There will be a loss of normal power to receptacles basement levels to third fl., lighting from fifth floor […]