Northwest Tower-Electric Service Interruption 3/8/2025

On Saturday, March 8th, 7-11 am, facilities and contractors will conduct electrical switchgear maintenance for floors 6 through 8; standard power will be de-energized; however, emergency power will be available during the outage. This means that all emergency outlets (RED) will be restored once the generator starts up. The affected devices are as follows: receptacles, […]

CSRB North Tower Addition-Electric Service Interruption 2/20/2025

On Thursday, February 20th from 4-6 am, the emergency lighting circuit for the NTA elevator lobbies will be shut off to reconnect the 4FL new emergency lighting and disconnect 7FL emergency lighting. This emergency circuit impacts BSL-3 lab lighting on the 4FL. NO work may occur in the 4th floor biohazard area during this outage.

McDonnell Medical Sciences Building-Exhaust Fan Service Interruption 2/12/2025

On Wednesday, February 12th, from 6 am to 2 pm, exhaust fan 18 will be shut down to facilitate the construction of the 9th-floor renovation project and ensure the safety of the electrical technicians changing the electrical feeds and control wiring. The areas affected are the 9th and 7th-floor labs and equipment that use exhaust […]

East Building-Elevator Service Interruption 2/17/2025

On Monday, February 17th, 2-6 am, as part of the modernization project, both elevators (#47 & #48) will be removed from service to allow contractors to perform work in the elevator shaft safely. Elevator #48 will be returned to service by 6 am.

CSRB North Tower Addition-Domestic Cold Water Service Interruption 2/12/2025

On Wednesday, February 12th 4-6 am, the domestic cold water to the 4th floor will be shut off during the outage to accommodate tying in a new water cooler in the 4th floor elevator lobby area. No domestic cold water will be available to restrooms (faucets, urinals, toilets), showers, and service sinks on the 4th […]