Elevators in the listed buildings will be out of service for about 2 to 4 hours between 7:00 am and 3:30 pm daily, between April 24 and April 28, to conduct annual inspections and fire recall tests as required by the Elevator Safety Unit of the Missouri Department of Public Safety. The elevators will be […]
Category: Outages
REVISED – 4444 Forest Park Avenue-Elevator Service Interruption 4/26/2023
Elevators in this building will be out of service for 2 to 3 hours on April 26, any time between 3:30 pm and 7:30 pm to conduct 5-year fire service recall tests as required by the Elevator Safety Unit of the Missouri Department of Public Safety. The elevators will be selected on a priority basis […]
CANCELED-McDonnell Pediatric Research Building, CSRB North Tower Addition, Clinical Sciences Research Building, Wohl Hospital, Wohl Clinic, Barnard Hospital, Renard Hospital-Electric Service Interruption 4/17-4/19/2023
Facilities Electricians will need to perform switching in the CSR-Substation, which provides power to the above listed buildings. This is to support Ameren de-energizing their equipment for maintenance work. On Monday, April 17th 6 am – Wednesday, April 19th 7 am, the CSRB Substation will be single lined to one utility, instead of the normal […]
Steven & Susan Lipstein BJC Institute of Health-Air Handling Unit Service Interruption 4/4/2023
On Tuesday, April 4th 5 am-6 am the vivarium and ABSL3/BSL lab suite B120 may experience a brief disruption of supply air flow while facilities completes work on the air handling system. During this time NO work shall take place inside of the ABSL3/BSL3 suite B120
1234 S. Kingshighway-Electric Service Interruption 4/12/2023
On Wednesday, April 12th from 5 pm to 9 pm there will be an electrical outage for the 1234 Kingshighway building. This is to add electrical equipment for the BJC Pharmacy. This will affect all electrical systems in the BJC Pharmacy area only in the specified time frame.
Completed-McDonnell Pediatric Research Building-Room Pressure Monitor Service Interruption 3/29/2023 6:30-8:30 am
The room pressure monitor serving the 8201-Entry room has failed and needs to be replaced. No work may occur in the 8201 BSL3 suite during this outage. UPDATE: The room pressure monitor has been replaced and all systems associated with the 8201 suite are operating normally. Work may resume in the 8201 suite.
Renard Hospital-Chilled Water Service Interruption 4/5/2023
On Wednesday, April 5th 12-6 am contractors will be working on the chilled water system for the 6th and 7th-floor project. No chilled water will be available during the above-noted dates and times. The entire building may experience warmer-than-normal temperatures during this timeframe.
McDonnell Medical Sciences Building-Air Handling Service Interruption 4/1/2023
On Saturday, April 1st from 4 am to 2 pm in the McDonnell Sciences building Air handling Unit three will be off for outside air damper repairs. This will affect supply air flow and temperatures for the 1st – 3rd floors in this time frame.
Completed-McDonnell Pediatric Research Building-Exhaust Fan Service Interruption 3/27/2023
On Monday, March 27th 1-4 pm facilities will be making repairs to the exhaust system serving BSL3 lab 7230. During this time NO work shall take place inside the BSL3 lab suite. At approximately 2:15 all systems returned to normal. Work may resume inside the suite.
Renard Hospital-Domestic Cold Water 3/28/2023