McDonnell Pediatric Research Building-Electric Service Interruption 6/6/2024

We will be transferring feeder “W” to feeder “D” to conduct needed repairs on the switchgear. We do not anticipate any blips, however the BSL should not be entered during the repair’s on June 6th 6 am. On June 7th, 2024, at 6:00 am the system will be put back to normal. Again, we ask […]

CSRB North Tower Addition-Elevator Service Interruption 5/21/2025

Elevators in this building will be taken out of service, one at a time as needed, to conduct fire recall tests as required by the Elevator Safety Unit of the Missouri Department of Public Safety. Each elevator will be returned to service once it is tested.

Jeffrey T. Fort Neuroscience Research Building-Steam Service Interruption 5/24-25/2024

This steam outage is needed to make modifications and repairs to the main steam station coming into the building. During May 24th 5 pm – May 25th 5:30 am there will be minimal heat being generated by our back up heating equipment. THIS HEAT WILL BE PROVIDED TO CRITCAL AREAS ONLY. All offices, labs, cagewash, […]

Cancer Research Building, South Medical Building-Electric Service Interruption 6/9/2024 7 am – 11 am

The purpose of this outage is to perform maintenance and testing on the ‘D’ feed portion of the Courtyard Substation switchgear. Facilities electricians will perform switching in all affected buildings, to isolate and de-energize the ‘D’ feed. Facilities electricians and Service Contractors will inspect and test the breakers, relays, and major components of the de-energized […]