Steven & Susan Lipstein BJC Institute of Health-Chilled Water Service Interruption 2/16-18/2024

Facilities will be assisting contractors with draining the chilled water for the entire building. No chilled water will be available from 11:00 pm February 16th to 10:00 AM February 18th. This will affect all systems that use chilled water. Temperatures in the building will be warmer than normal in some areas. Temporary cooling will be […]

CSRB North Tower Addition-Electric Service Interruption 3/10/2024 – 7-11 am

The purpose of this outage is to perform maintenance and testing on the ‘D’ feed portion of the NTA main electrical switchgear. Facilities electricians will perform switching, to isolate and de-energize the ‘D’ feed. Facilities electricians and Service Contractors will inspect and test the breakers, relays, and major components of the de-energized portion of the […]

CSRB North Tower Addition-Electric Service Interruption 3/10/2024 7-11 am

The purpose of this outage is to perform maintenance and testing on the ‘D’ feed portion of the NTA main electrical switchgear. Facilities electricians will perform switching, to isolate and de-energize the ‘D’ feed. Facilities electricians and Service Contractors will inspect and test the breakers, relays, and major components of the de-energized portion of the […]

REVISED-Wohl Clinic, Wohl Hospital, Barnard Hospital, Renard Hospital, CSRB North Tower Addition, Clinical Sciences Research Building, McDonnell Pediatric Research Building-Electric Service Interruption 2/25/2024

On Sunday, February 25th 4-7 am Facilities contractor’s will be trouble shooting switchgear, no power loss or blips is expected. As a precautionary measure , no work may occur in NTA 4th fl. ABSL3 suites and PEDS MPRB suites 7230, 7301,730 and 7230.

McDonnell Pediatric Research Building-Electric Service Interruption 2/26/2024

On Monday, February 26th 9-11 pm Facilities will be making a building transfer in McDonnell Pediatric for the above time in order to install metering on the front of the switchgear. Building should not see a power interruption, the generator will run due to fire pump loss of power during the duration of the outage.