Bernard Becker Medical Library, South Medical Building, Cancer Research Building, 4533 Clayton Ave, Specialized Research Facility East, Specialized Interim Research Building-Fire Alarm Service Interruption 1/11/2024

WUSM Facilities Technicians will be testing the Audio/Visuals for the fire system on January 11th 5-7 am. During this time you will hear messages and see strobes throughout the buildings listed. Occupants do not need to leave the building during this test.

Steven & Susan Lipstein BJC Institute of Health

On Thursday, January 11th 5-7 am contractors will test the exhaust system that serves labs on floors 7 through 11. No work should be performed in any fume hoods on floors 7 through 11 during this time.

4560 Clayton Avenue-Fire Alarm Service Interruption 1/4/2024

On Thursday, January 4th, from 9-11 am, Facilities will be testing the audio/visuals for the fire alarm system in the Central Institute Research building. During this time, you will hear horns and see strobes throughout the entire building; occupants do not need to leave the building during this test.

Clinical Sciences Research Building-Hot Water Service Interruption 12/21/2023

On Thursday, December 21st 2-10 am Facilities will be assisting contractors with draining the heating hot water for the 7th floor. The temperature for the air handler supply will be raised to provide heat to the entire floor. The entire floor may experience cooler-than-normal temperatures during this time.