3/14: McMillan, Planned Service Interruption – Chilled Water
Facilities will drain the chilled water in the building to assist contractors with upgrading the system. On 3/14 from 4 am to 6 pm, facilities will place supplemental spot coolers in certain areas and monitor other areas as needed. Customers may notice warmer-than-normal temperatures during these times.
3/18: McDonnell Medical Science Building, Planned Service Interruption – Electric
On 3/18, from 6 am to 11 am, facility electricians and contractors will conduct electrical inspections on the building switchgear “W” sub. We do not anticipate any power loss or blips during the maintenance inspection.
3/19: McDonnell Medical Science Building, Planned Service Interruption – Electric
On 3/19 from 6 am to 11 am, facility electricians, along with the contractor, will conduct an electrical maintenance inspection of the building switchgear USS2 “D”. We do not anticipate any power loss or blips during the inspection period.
3/28-4/25: Crane Picks at the Corner of Scott and Taylor Avenues
Starting on Saturday, March 28, there will be a total of four crane picks at the corner of Scott and Taylor Avenues on four separate Saturdays. The highlighted space will be necessary for the crane, material delivery, and a pickup truck. Two flaggers will be on the ground directing traffic to keep one lane open […]
3/9-4/2: Fort Labs, Planned Service Interruption – Electric
From 6 am to 8 am from 3/9 to 4/2, facilities electricians, along with contractors, will de-energize power on select floors per the scheduled dates. Power will be affected only from 6 AM – 8 AM on Mondays – Thursdays for the duration of the outage listed above. The purpose of this outage is to […]