8/2: Planned Service Interruption – Becker Medical Library, Air Handling Unit
on 8/2, from 4 am to 4 pm, Air Handler 2 will be shut down to facilitate the installation of a new air filtration system. During the outage, there will be no airflow, cooling, or heating capabilities that affect floors 1 through 7 and the Atrium. Thank you for your patience.
8/9: Planned Service Interruption – Becker Medical Library, Air Handling Unit
On 8/9, from 4 am to 4 pm, Air Handler 1 will be shut down to facilitate the installation of a new air filtration system. During the outage, there will be no airflow, cooling, or heating capabilities affecting the Basement, 1st, 6th, and 7th floors. Thank you for your patience.
8/16: Planned Service Interruption – Becker Medical Library, Air Handling Unit
On 8/16, from 4 am to 4 pm, Air Handling Unit 3 will be shut down to install a new air filtration system. During this outage, there will be no airflow, cooling, or heating capabilities affecting the 4th and 5th floors. Thank you for your patience.
7/25: Planned Service Interruption – Farrell Learning and Teaching Center, Air Handling Unit
On 7/25, from 7 am to 3 pm, Air Handling Unit 2 will be shut down to facilitate the repair of a supply air damper in room 302. During this time, reduced airflow and cooling capacities will be felt, affecting all floors. Thank you for your patience.
7/31: Planned Service Interruption – McMillan, Electric
On 7/31, from 5:30 am to 7 am, electrical contractors will be removing electrical panels on the 10th floor to safely complete the scheduled work. As a result, power to portions of the 9th floor will be temporarily shut off. Electrical service will be restored as soon as the work has been completed.