May 26-June 12: Temporary Bridge Closure, 7th Floor Rand Johnson to 5th Floor Southwest Tower

Sent on behalf of Barnes-Jewish Hospital. For about three weeks, the bridge connecting Rand Johnson’s seventh floor to Southwest Tower’s fifth floor will be closed while four MRIs are removed from the Mallinckrodt Institute of Radiology building. Cranes will hoist equipment and MRIs over the bridge, so the closure is a necessary safety precaution. If […]

5/15: Planned Service Interruption – 4560 Clayton, Electric

On 5/15, from 7 pm to 9 pm, , Facilities will be conducting an Emergency Generator and Automatic Transfer Switch (ATS) test for the newly installed mechanical equipment and general life and safety items in the facility. During this test, normal commercial power will be disrupted, and the facility will be on emergency power. A […]