McDonnell Pediatric Research Building-Air Handling Unit Service Interruption 6/22/2025
On Sunday, June 22nd, 6 am – 3 pm, the air handler serving the first-floor administration offices and restrooms will be offline for repairs. Airflow in the affected areas will be minimal, and temperatures will be warmer than normal.
McDonnell Medical Sciences Building-Vacuum Service Interruption 6/27-28/2025
During Friday, June 27-28, 8 pm – Saturday, June 28th, 4 am, the Lab Vacuum will be shut down to facilitate new duct work occurring on the 8th & 9th floor renovation construction. This will affect the entire vacuum system in the facility. Thank you for your patience during this time.
Steven & Susan Lipstein BJC Institute of Health-HVAC Service Interruption 6/20/2025
On Friday, June 6th, from 8 to 9:30 am, facilities technicians will repair the HVAC system serving the B120 BSL3 suite. During this time, NO work will be conducted in the suite.
Gary C. Werths Siteman Cancer Center-Hot Water Service Interruption 6/28/2025
On Saturday, June 28th, 6 am—4 pm, Contractors will isolate the building’s hot water to repair a leak and install valves. The building may experience areas with limited heat.
CSRB North Tower Addition-Elevator Service Interruption 6/30-7/1/2025
Elevator #3 will be taken out of service, starting Monday, June 30th, at 7 am, for adjustments and repairs. The elevator will be returned to service once all work is complete.