On Monday November 13th at 9 am cold room 3912 for the South Medical building failed. We are working on getting the parts needed for repairs. This affects all labs on the 3rd floor that store items in this cold room. No items should be stored in this cold room at this time.
News
McDonnell Medical Sciences Building-Exhaust Fan Service Interruption 11/21/2023
On November 21st from 3 am to 7 am we will be performing preventive maintenance on the exhaust fans that serve BSL3 lab 562 in McDonnell Medical Science. NO WORK SHALL TAKE PLACE IN THE 562-BSL3 LAB DURING THIS OUTAGE.
Clinical Sciences Research Building-Elevator Service Interruption 11/22-27/2023
The CSRB Service Elevator (Elevator #8) will have access to the 2nd floor locked out, starting Wednesday, November 22, at 4 pm. During this period, contractors will be painting the walls and epoxying the floor directly outside the elevator. Access to the 2nd floor will be restored on Monday, November 27, at 6 am.
Mallinckrodt Institute Radiology-Elevator Service Interruption 12/17/2023
Elevator 103 will be out of service on Sunday, December 17, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back in service at noon.
Mallinckrodt Institute Radiology-Elevator Service Interruption 12/03/2023
Elevator 102 will be out of service on Sunday, December 3, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back in service at noon.
Clinical Sciences Research Building, McDonnell Pediatric Research Building-Electric Service Interruption 12/10/2023
The purpose of this outage is to perform maintenance and testing on the 4160V switchgear that distributes power to the CSRB Chillers. This is the 2nd of two outages to do this work. Facilities electricians will perform switching to isolate and de-energize the ‘W’ Feed portion of the switchgear. When all work is complete the […]
Specialized Research Facility East-Air Handling Unit Service Interruption 11/15/2023
The purpose of this outage is to replace a failed component on one of the supply fans for the Air Handler Unit that supports the 2nd floor. During the blackout, the supply air for the 2nd floor will be off as the Air Handler Unit has to be turned off to replace the component safely. […]
Clayton Garage-Elevator Service Interruption 12/4/2023-4/5/2024
The Clayton Garage remodel project for the North bank of elevators (#60 & #61) will begin the morning of Monday December 4th, 2023. Elevator #61 will be taken out of service first and will be out of service for ~17 weeks while elevator #60 will remain running. Protection will be provided around each elevator while […]
McDonnell Pediatric Research Building-Compressed Air Service Interruption 11/14/2023
On Tuesday, November 14th 5-9 am there will be an outage that will effect the seventh floor up to the tenth floors that use compressed air for sterilizers in the BSL3 labs, air tables, fermentation room, glass washers, and autoclaves. No lab air will be available during this time frame.
Clinical Sciences Research Building, McDonnell Pediatric Research Building-Electric Service Interruption 12/4/2023 6-10 am
The purpose of this outage is to perform maintenance and testing on the 4160V switchgear that distributes power to the CSRB Chillers. This is the 1st of two outages to do this work. Facilities electricians will perform switching to isolate and de-energize the ‘D’ Feed portion of the switchgear. When all work is complete the […]